Commercial Building Construction

Situated on Maulana Azad Road, directly opposite M.M. High School in Panayapally, this building stands as a testament to modern construction excellence.

Let’s delve into the construction highlights and additional details of this impressive three-story structure:

  1. Foundation: The building’s foundation is supported by robust R.C.C. raft and beam foundations, ensuring its stability and longevity.
  2. Superstructure: The superstructure boasts a sturdy R.C.C. framed structure, complete with columns, beams, and slabs, further enhancing its structural integrity.
  3. Roofing: The roofing is impeccably executed using high-quality aluminium roofing sheets, providing durability and protection from the elements.
  4. Flooring: Throughout the interior, elegant 800 x 800 cm vitrified tiles adorn the floors, offering both aesthetics and practicality.
  5. Aesthetics: To enhance the overall aesthetics of the building, external wall tile cladding and provisions for gardens have been incorporated.
  6. Security: The building is equipped with a state-of-the-art biometric locking system, ensuring top-notch security for its occupants.
  7. Eco-friendly: A hybrid solar system with 100% load-bearing capacity has been installed, reflecting a commitment to sustainable energy solutions.

Construction Highlights:

Commercial Building Construction

Additional Details:

  • Ground Floor Flooring: The ground floor features premium vitrified tiles, exemplifying a dedication to quality in every aspect of the construction.
  • Bathrooms: All bathroom floors are outfitted with anti-skid ceramic tiles, complemented by dado work featuring glazed tiles for both safety and style.
  • Walls: The interior and exterior walls are meticulously plastered with a 15 mm thick cement mortar mix in a 1:4 ratio, ensuring a flawless finish.
  • Water Supply: The building is equipped with a ground-level water tank boasting a 1000-litre capacity, while an overhead water tank provides an additional 1500-litre capacity, guaranteeing a reliable water supply.
  • Sanitary and Plumbing: High-quality sanitary fittings from ‘Hindware’ have been used, coupled with Jaguar water supply fittings, showcasing a commitment to excellence in plumbing.
  • Electrical: Electrical wiring is executed using high-grade Finolex wires, emphasizing safety and reliability.

Project Timeline:

Construction of this remarkable building commenced in June 2016, with the structural work completed by October 2016, well ahead of schedule. Ongoing exterior beautification efforts continue to enhance its overall appeal.

For inquiries regarding design and project details, please feel free to reach out to us.

Leave a comment